
5 Putting into operation
17 C-660 Operation Manual, Version F
3
6
7
8
The collector head e is found on the collec-
tor arm h of the fraction collector. Clamp the
tubing guide f (metal pipe) tightly into the
collector head g.
Ensure that the height of the tubing guide f
is correct. It should be at least 1 cm above the
tube rim, so that it will not damage the tubing
during operation.
Now direct the FEP-tubing c from valve out-
let b and afterwards through the tubing guide
f, so that it pokes out approximately 3 mm.
Connect the valve to the WASTE VALVE con-
nection i.
9
Fig. 5.3: Installating the waste diverter valve
2
3
4
1
8
5
6 7
9
10
Fig. 5.4: Control arrangement on the Pump Controller
a Power cord
b FUSE 0.5 AT: Fuse
c WASTE VALVE: Valve control
d WASTE LEVEL: Monitoring of valve bottle
level
e TTL IN/OUT: TTL connection
f DETECTOR IN 1,2: Detector inputs 1 + 2
g X-T RECORDER 1,2: Chart recorder outlets
1 + 2
h RS 232: Series data interfaces
i RS 485: 2× bus interface for peripheral
devices (fraction collector, pumps, etc.)
j Address bus switch for remote control
position 1 or 2 for SepacoreControl,
position 0 for manual mode
Komentarze do niniejszej Instrukcji