
6 Operation
19 F-125 Manual, Version B
6.2 Preparing for use
Prerequisites
All parts must be clean and free of damage.•
Close the drain valve.•
6.2.1 Install the Rotavapor
®
on top of the Chiller
For installation of the Rotavapor
®
on the Chiller you need a transportation specialist. You need at
least two people to lift the Rotavapor
®
onto the top of the Chiller Trolley. Mount four carry belts on the
Rotavapor
®
feet . Install one of them on each end. Check for proper seating of the belts. Now lift the
Rotavapor
®
evenly onto the Chiller Trolley.
CAUTION
Risk of minor or moderate injury due to the heavy weight of the instrument.
Utilize a second person to transport the instrument•
Do not drop the instrument or its transport box•
Place the instrument on a stable, even and vibration-free surface•
Keep limbs out of crushing zone•
6.2.2 Installing the hoses
WARNING
Stumbling or falling due to improper installation of the cables and hoses.
The length of the cables and hoses should be kept as short as possible•
If possible, avoid installing cables and hoses in aisle areas•
If installation of cables and hoses in aisle areas is unavoidable, use an adequate protective •
pad in order to avoid the danger of stumbling and damage
Connect out flow and return flow connections of the Recirculating Chiller with the condenser of the •
rotary evaporator.
NOTE
Only use hoses which can withstand min. -20 °C and 2 bar pressure and secure them with the usual
hose clamps.
Setup for a complete Rotavapor
®
system, includes second condenser on the Chiller and condenser
on the Rotavapor
®
:
Cooling medium flow IN / OUT for second condenser to the second condenser installed on the •
Chiller.
Connect the main cooling medium flow OUT to the bottom inlet of the cooling coil of the •
Rotavapor
®
.
Connect the main cooling medium flow IN to the top outlet of the cooling coil of the Rotavapor•
®
.
See also section 5.2 “Cooling water routing”.•
Komentarze do niniejszej Instrukcji