Buchi Rotavapo R-220 SE Instrukcja Użytkownika Strona 58

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
Przeglądanie stron 57
5 Putting into operation
58 R-220 SE Operation Manual, Version F
5.15.1 Water as heating transfer medium
With the heating bath in lowest position, install the level drain output tube with a level difference of
> 5 cm towards the sink to ensure safe draining. Fixate all tube connections with hose clamps!
NOTICE
Risk of damage caused by heating transfer mediums.
Do not fill the heating bath to overflow
Do not leave the system unattended when replenishment is active
Check the level drain for proper drainage function in lowest heating bath position
Do NOT connect the replenishment tap to a water source in case
a heating transfer medium different to water (e.g. glycerin) is used!
!
!
VAPOR TEMP.
CW TEMP.
LEVEL 2
LEVEL 2
CW FLOW
RESERVE
INPUT
RS-485
RS-485
AERATE
CW VALVE
VACUUM VALVE
F1 F2 F3 F4
12A
12A 12A 12A
FOAM DET.
ALARM OUT
USB
220- 240 V AC
MAX. 2A
AC IN
(Type plate)
Sink (dummy)
Sink (dummy)
a
b
c
d
e
To condenser
Przeglądanie stron 57
1 2 ... 53 54 55 56 57 58 59 60 61 62 63 ... 108 109

Komentarze do niniejszej Instrukcji

Brak uwag