Buchi DuMaster D-480 Instrukcja Użytkownika Strona 189

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 356
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 188
Operation Manual D-480 ©BÜCH Labortechnik AG
8 - Maintaining the instrument 189
Furnace area
The following picture shows the details of the furnace area:
Legend:
1 Handle
2 Bayonet catch
3 Reduction tube connection
4 Post combustion tube connection
Phase 2: Removing the ash crucible
Proceed as follows:
Open the front door.
Unscrew the combustion tube connector. To do so, turn the bayonet catch handle (1) slowly to
the right.
Remove the ground-in clamp on the reduction tube (3).
Remove the O
2
supply tube by opening the two ground-in clamps.
Remove the ground-in clamp on the post combustion tube (4).
Top view furnace
The following picture shows a top view of the furnace pulled out:
Legend:
1 Post combustion tube plug
2 Post combustion tube
3 Combustion tube connection
4 Combustion tube
5 Reduction tube plug
6 Reduction tube
Phase 2: Removing the ash crucible (continued)
Proceed as follows:
Przeglądanie stron 188
1 2 ... 184 185 186 187 188 189 190 191 192 193 194 ... 355 356

Komentarze do niniejszej Instrukcji

Brak uwag