Operation Manual D-480 ©BÜCH Labortechnik AG
9 - Repairing the instrument 247
Plug the protective earth conductor back into the rear wall.
Attach the rear wall again.
Phase 4: Switch the instrument on again
Proceed as follows:
Plug the power supply plug of the analyzer into the socket.
Switch
PC,
monitor
and printer on.
Wait until the boot process is completed.
Switch the main instrument switch on. The instrument performs a reference run of the VLS.
Launch the operating software. See Starting the operating software (on page 130).
Set the normal temperatures as the setpoint temperature of the furnaces. To do so, open the
"Instrument parameters" dialog in the operating software by selecting Options > Settings >
Parameters.
Once the setpoint temperatures have been reached the instrument is ready to measure again.
What to do after a computer crash
After a computer crash
Because open documents are saved to a temporary file every 3 minutes, large-scale loss of data is
not usual. After a computer crash, restart the operating software and the software automatically loads
the most recent temporary file.